Duplex systems consist of two softening units and regeneration process is set with flow control in these systems.
When resin exchange capacity is exhausted, regeneration process which consists of five main steps that are backwash,brine and slow rinsing, rapid rinsing and refilling salt tank starts. In regeneration, resin leaves hardness ions to water and sodium ions are taken back again from the brine prepared in the salt tank so that system is ready to another service cycle.
MODEL |
TANK SIZE |
FLOW m3 /hour Max. VELOCITY = 40m3 /m3 -resin.hour |
MINERAL RESIN (lt) |
OS-20 |
8X35" |
0,8 |
20 X 2 |
OS- 50 |
10X54" |
2 |
50 X 2 |
OS- 80 |
13X54" |
3,2 |
80 X 2 |
OS- 150 |
16X65" |
6 |
150 X 2 |
OS- 200 |
18X65" |
8 |
200 X 2 |
OS - 300 |
24X72" |
12 |
300 X 2 |
OS - 500 |
30X72" |
20 |
500 X 2 |
OS -900 |
42X72" |
24 |
900 X 2 |
OS - 1200 |
48X72" |
48 |
1200 X 2 |